The Kingston Record

Kingston Heritage Properties Committee

March 22, 2023

What was decided (7 motions)

6 carried, 1 recorded otherwise. Every motion below is printed as the minutes print it.

That Councillor Glenn be elected as Chair of the Kingston Heritage Properties Committee
Moved by Councillor Oosterhof, seconded by Ms. McFarlane
Carried
That Jane McFarlane be elected as Vice-Chair of the Kingston Heritage Properties Committee
Moved by Councillor Glenn, seconded by Ms. Demitor
Carried
That the agenda be amended to include a correction to Report HP-23-002, and as amended, be approved.
Moved by Ms. Demitor, seconded by Councillor Oosterhof
Carried
That alterations to the property at 2312 Princess Street be
Moved by Ms. Demitor, seconded by Ms. McFarlane
Referred
That the Kingston Heritage Properties Committee recommends to Council: That the Notice of Intention to Demolish at 61 Baiden Street be received and no further action be taken; and That the listed status of the property at 61 Baiden Street be removed from the City of Kingston Heritage Register, pursuant to Section 27 of the Ontario Heritage Act.
Moved by Mr. Legnini, seconded by Ms. Stevens
Carried
That the Kingston Heritage Properties Committee supports Council approval of the following: That alterations to the property at 199 Earl Street, be approved in accordance with details as described in the application (P18-003-2023), which was deemed complete on January 26, 2023 with said alterations to include: 1. The replacement of the existing deteriorating garage, excluding the stone walls to the north and west of the structure, which abuts 201 Earl Street; Kingston Heritage Properties Committee Meeting Number 01-2023 – Wednesday, March 22, 2023 at 9:30 a.m. Page 10 of 12 2. The repair and repointing of the masonry of the stone walls, where necessary and in accordance with the City’s Policy on Masonry Restoration in Heritage Buildings; 3. The removal of the non-heritage portions of the existing garage and the reinstatement of the garage on the existing building footprint; 4. The reconstruction of the garage will use the following materials: fibre cement, fibreglass, modified bitumen membrane, and aluminum or steel, the concrete foundation will be poured to match the existing building footprint; 5. A flat roof on the front two-thirds of the structure, and a sloped roof towards the rear of the structure that is in line with the stone wall; 6. The installation of two small horizontal fiberglass picture windows and one set of French doors along the east elevation; 7. The installation of a painted fiberglass overhead garage door; 8. Exterior cladding of painted fiber cement boar
Moved by Ms. McFarlane, seconded by Ms. Demitor
Carried
That the meeting of the Kingston Heritage Properties Committee adjourn at 11:55 a.m.
Moved by Ms. Demitor, seconded by Ms. McFarlane
Carried

The town’s own record

Read the minutes this page was read from →

Where this page and that document disagree, the document is right and this record is wrong. Say so and it will be corrected.